Preaparing for final drawing
cropped Main-ISO
Making base-drawing which will be use in Final drawings
Plan, Base drawing
3d element. Currently, the design has added another pipe layer, the spiritual water pipes.
Later on - steel beam will be installed to support all pipes and water containers. Since the site is locate in between buildings, the structure could be attached to those building.
Spiritual Water container - adjust the shape of the vessel
Placing above the Linga, These vessel will contain Ganges water,Milk and Yogurt
Manhole/basin/sewage cover Design, this manhole cover will be install under the lingam to drain the water during daily washing routine.
No comments:
Post a Comment