Monday, April 8, 2013

Structure Update

The permanent structure will be the escalator, track for robot arm and columns that support the whole structure. The bamboo modular units will be assembled together to create the floor, and cover that platform during the day which can be remove. The uncut bamboo sticks are laid on the extended lid to create the floor and steps.


The grey units of the modular are permanently attached to the track, so that it guides the bamboo modular where to be placed on the platform.


Zoom in how the bamboo are laid to create steps. Each bamboo has 7 cm diameter, they are 2 layers of bamboo for each step, therefore each step is 14 cm high.


Bamboo test rendering



No comments:

Post a Comment