Monday, March 18, 2013

Tibetan Buddhism_Weekly Update


Process
Adjusting ground conditions (slopes)  in preparation for project sketching.




Ground conditions (slopes). Road networks and Sidewalks. It takes quite a long time to get these slopes in place. This will need to be very accurate as it will be the base for the entire project. The previous model of the sidewalk, somehow, The curvatures and slopes of them make it impossible to 3d model the road in between. Therefore, in this model I started to make the road first and then try to fit the sidewalks in.



Site condition showing all the shop signage and also the extended billboards which extends from the building facades or sometime both hung and extended through cables and truss structures.


Site condition with all the finished front facades and shop fronts. All visible within the vantage point of the pedestrians crossing on the crosswalk.

Site condition showings only building facades and shop fronts.

Preliminary Billboard hanging/extended support structure. 



The Followings are views from all the 4 directions, North, South, East and West. from the vantage point of a pedestrians crossing on the crosswalk.


North

East

South

West



No comments:

Post a Comment