I. Locating the pipe line
Key element :
- main pipe- connection to service resouvior, operate with the high pressure, pipe size = d= 700mm-2000mm, In this project, the pipe diameter is 1000m (average).
- Submain/Distribute main d= 152.4 - 508 mm, reduce/ adjust the pressure from the main pipe
- Fire Hyrant line H20 is distributed to the fire hydrant has to be adjust the water pressure to mininum 40 pound/ sq in
- Service line- this line connect to the building, some might use copper pipe/Upvc or cast iron pipe.
- Sewer line located the deepest among other pipe. connect from the building's sewage, strom sewer, catch basin. (Grey water/black water)
Start modelling all the existing pipe,in which the project will be connect to this infrastructure.
No comments:
Post a Comment